2025-0009 | Shutdown Permit and Approval: Annual Terminal generator inspection/testing - Annual Terminal generator inspection/testing note the testing will be conducted over two nights, 26th and 28th Feb, 10.30pm start time and 4am finish each night. All run testing will be done between 1am and 3am (Feb 26, 2025 23:00 - Feb 28, 2025 04:00) |
2025-0010 | Shutdown Permit and Approval: Replacement of PRV - Install new PRV on water entry serving the glycol tank farm (Feb 26, 2025 08:00 - Feb 26, 2025 15:00) |
In Service