This Hot Work Permit is required for any temporary operation involving open flames or producing heat and/or sparks. This includes, but is not limited to: Brazing, Cutting, Grinding, Soldering, Thawing Pipe, Torch Applied Roofing and Welding.
Available sprinklers, hose streams and extinguishers are in service/operable Hot work equipment is in good repair
Requirements within 11 m (35 ft.) of hot work Flammable liquids, dust, lint and oily deposits removed Explosive atmosphere in area eliminated Floors swept clean
Combustible floors wet down and covered with damp or fire resistive sheets Other combustibles removed (if possible) or protected with fire resistive tarps or shields All wall and floor openings covered Fire resistive tarps suspended beneath elevated work
Work on walls or ceilings Construction is non-combustible and without combustible covering or insulation Combustibles on other side of walls moved awayWork on enclosed equipment Enclosed equipment cleaned of combustibles Containers purged of flammable liquids/vapors Pressurized vessels, piping and equipment removed from service, isolated and ventedFire Watch Fire Watch will be provided for 30 minutes during and after work, including coffee/lunch breaks Fire Watch has suitable fire equipment readily available Fire Watch is trained in use of equipment and in sounding alarm
a. Verify precautions listed above (or do not proceed with work) b. Complete section below c. Issue Hot Work Permit (Max 2 weeks) unless prearranged
Person Approving Hot Work Permit:
Approval Date:
Permit Expiry Date:
Comments/Requirements: